Playbacks timeline
Playback 0
Details:
The theme for this playback is generally “Discover and analyze the process”. This playback occurs during a time when the plan and implement phase overlaps the discover and document phase. Traditionally, it is the only playback done during this phase. The other playbacks are done fully during the plan and implement phase.
Activities include:
- Discover the process
- Author the as-is process
- Analyze and improve the process
- Author the to-be process
- BPM analyst (1)
- BPM developer (1, part-time)
- BPM project manager (1)
- BPM solution administrator (as needed)
- Process owner and process participants (SMEs) (as needed)
Playback 1
Details: The theme for this playback is generally “Build the process”. Activities include:
- Author the business process definition
- Define the roles or participants
- Define the business objects and variables
- Configure the screens
- Model rules across the screens and model
- BPM analyst (1)
- BPM developer (3)
- BPM project manager (1)
- BPM solution administrator (as needed)
- Process owner and process participants (SMEs) (as needed)
Playback 2
Details: The theme for this playback is generally “Connect into the infrastructure”. Activities include:
- Configure data flow
- Connect to other systems of record
- SMTP
- Data warehouse
- Integrate LDAP or single-sign on (SSO)
- EAI
- BPM developer (3)
- BPM project manager (1)
- BPM solution administrator (as needed)
- Process owner and process participants (SMEs) (as needed)
One of the BPM developers is usually a technical consultant or has the skills of a technical consultant to assist with integrations. If you are completing a project using Advanced and Integration Designer, some Integration Designer developers would join the development team.
Playback 3
Details: The theme for this playback is generally “Refine the delivery”. Activities include:
- Model corner cases
- Expand search capabilities
- Build metrics and performance reports (tuning and measurement)
- Other types of processing automation
- Feedback from playbacks
- Refine user interfaces (UI)
- BPM developer (3)
- BPM project manager (1)
- BPM solution administrator (as needed)
- Process owner and process participants (SMEs) (as needed)